Outlet Watts

Landlord and HOA request letters for plug-in solar

By the Outlet Watts editors. Published Nov 20, 2026.

A clear request answers the questions a landlord or board will have before they ask. Edit these to match your kit and your state.

Letter to a landlord

Dear [landlord],

I'd like to install a small plug-in solar panel on my balcony at [address, unit]. It's a [brand and model], [watts] W, certified to [standard] by [lab] (listing [file number]).

It attaches to the balcony railing with clamps; nothing is drilled or wired into the building. It plugs into the existing outdoor outlet [or: the outlet at (location)], and its inverter shuts off automatically if the power goes out.

[If your state has a law:] [State]'s law ([bill or statute]) covers devices like this. [Virginia: I'm giving the 7 days' written notice the law provides. / Vermont: This is my 10-day notice under Act 149.]

I'll remove it and restore the space when I move out, and my renters insurance covers it [policy number]. A product sheet and photo of the mounting are attached. Could you confirm in writing that this is fine, or tell me any placement rules you'd like me to follow?

Thanks, [name, phone]

Request to an HOA or condo board

To the [association] board,

I'm requesting approval to install a [watts] W plug-in solar panel at [unit/address], mounted on [my balcony railing / a ground stand on my patio / my fence], facing [direction]. It's [brand and model], certified to [standard] by [lab].

The panel is [size] and [color]. It's secured with [mount], rated for [wind rating if the maker gives one], and stays within my unit's [balcony/patio]. It plugs into my unit's outdoor outlet and doesn't affect common wiring.

[Colorado, from Jan 1, 2027: Under HB26-1007, covenants can't unreasonably restrict these devices; I'm glad to follow reasonable placement and safety rules.] [Vermont: Act 149 says covenants can't prohibit these devices.]

I carry insurance covering the device and accept responsibility for it. A product sheet and a photo of the planned location are attached.

[name, unit, phone]

Tips that help

  • Lead with the certification and the no-drilling mount; those answer the two biggest worries.
  • Include a photo or mockup. Boards decide faster when they can see it.
  • Keep a copy and the date you sent it. Vermont's and Virginia's notice periods run from that date.
  • See the state rules for renters and HOAs and condos.