Outlet Watts

How to notify your Maine utility about plug-in solar

By the Outlet Watts editors. Checked Nov 20, 2026.

Solar panels covered in snow
Photo: Budget Bizar / Pexels

In Maine, small systems need no notice at all. Bigger ones need an electrician, a dedicated circuit, and a form sent to the utility within 30 days after installation.

The two tiers

  • Up to 420 W of combined inverter output per service address: no notice.
  • 420 W to 1,200 W: a Maine-licensed electrician installs a dedicated circuit with a single outlet, and you notify the utility within 30 days on the Maine PUC's form.

Where to send the form

Central Maine Power

Email cmp_plug-in_solar@cmpco.com or mail to 83 Edison Drive, Augusta, ME 04336, per the Maine PUC.

Versant Power

Email dginterconnections@versantpower.com or mail to Versant Power, c/o DG Interconnections, PO Box 932, Bangor, ME 04402. Versant says it doesn't install, inspect or approve these systems, may disconnect service if one creates a hazard, and that they don't earn bill credits or Net Energy Billing.

Before you buy

Maine requires UL 3700, a comparable standard, or a National Electrical Code configuration. Kits with only certified parts may not qualify; see the certified kits guide.

More: Maine rules.