Zendure SolarFlow Kit (US)
A complete storage kit at a high price. Also sold out.
Specs and price checked Nov 20, 2026 Not tested by us
A complete storage kit: Hub 2000, an AB2000S battery (1.92 kWh), an APsystems EZ1-LV inverter and rigid panels, listed at $3,932 and sold out on Nov. 20, 2026.
What stands out
- Everything in one box. Panels, battery and inverter, with an "anti-backfeed" smart CT mode.
- Certification. Zendure says the microinverter is UL 1741 certified. No UL 3700 claim for the kit.
The trade-off
At nearly $4,000 it's the most expensive product we list, and the battery is what you're paying for. In low-rate states it's hard to see it paying back; run the calculator at 95% use with the full price before considering it.
Specs
- Type
- Battery system
- Price
- $3,932 (List price; sold out)
- Panel
- Not included
- Inverter output
- 900 W
- Battery
- 1.92 kWh
- Export
- Grid-tie with 'anti-backfeed' smart CT mode
- Certification
- Microinverter certified to UL 1741 (per Zendure). No UL 3700 claim.
- Mounting
- Rigid panels included (count not listed)
- Warranty
- 10 years
- Plug
- Standard outlet
- Where sold
- None stated
Against each state's law
How the product's size and certification line up with the states that have plug-in laws. This compares published specs to the law's text; it isn't legal advice.
| State | Against the law's text | Notes |
|---|---|---|
| California | Needs system certification this product doesn't claim | law starts Jan 1, 2027 |
| Colorado | Fits the law's limits | over 391 W: dedicated circuit or electrician expected |
| Connecticut | Fits the law's limits | — |
| Maine | Needs system certification this product doesn't claim | over 420 W: dedicated circuit or electrician expected |
| Maryland | Fits the law's limits | over 391 W: dedicated circuit or electrician expected |
| New Hampshire | Fits the law's limits | law starts Jan 1, 2027 |
| New Jersey | Needs system certification this product doesn't claim | law starts Mar 1, 2027; over 400 W: dedicated circuit or electrician expected |
| Utah | Fits the law's limits | — |
| Vermont | Needs system certification this product doesn't claim | — |
| Virginia | Fits the law's limits | law starts Jan 1, 2027; over 391 W: dedicated circuit or electrician expected |