How to notify your Maryland utility about plug-in solar

Maryland requires notice to your utility before you plug in a portable solar system. Each utility handles it differently. Here's what each has published, as of Nov 20, 2026.
The rule
Under HB 1532, one system per meter, residential only, up to 1,200 W, certified by UL or an equivalent lab. Notify the utility before installing, with a certification of the device's safety features and maximum capacity. No approval or fee is allowed; if the utility requires an automatic locking disconnect, you pay to install it.
By utility
Potomac Edison (FirstEnergy)
Fill in the online form, click "Continue to Email Form," then send the email it creates to pe-md_interconnection@firstenergycorp.com. The form asks for your premise and account numbers, name and email, the system's AC and DC watts, and whether it's UL or equivalently certified. FirstEnergy notes its standard Maryland meter has no separate register for power fed back to the grid.
SMECO
Register through SMECO's self-registration web form, or email portablesolar@SMECO.coop (per the PSC). SMECO says it won't install, inspect, maintain or approve these systems, members install at their own risk, and it may disconnect service if a system creates a hazard.
Pepco and Delmarva Power
Both have "balcony and portable solar systems" pages linked from the PSC. Start there for the current form.
BGE
We didn't find a BGE web page or form. The PSC lists BGE's customer line, 1-800-685-0123, as the contact.
Keep a record
Save the confirmation email or note the date and name of who you spoke with. The law requires notice before installation, so the date matters.